Historic row-home trim restoration
Wilmington7 daysCarpentry
Scope: Period crown molding restored in three rooms, baseboard fabricated for an added hallway, split door casings replaced, paint color-matched.
Challenge: Matching 1920s trim profiles meant a custom router setup to replicate the existing crown.
Result: Finished ahead of schedule. The new trim is indistinguishable from the original under paint.
Retail space fit-out
Wilmington10 daysCommercial
Scope: Custom wall shelving, new circuits for track lighting, a 12-foot signage backer, and a sound system for a new boutique.
Challenge: A hard grand-opening date with tight material lead times.
Result: Done two days before opening with a clean punch list.
Lakeside deck restoration
Bear4 daysExterior
Scope: Deck boards replaced, two joists sistered for rot, railing raised to code, marine-grade stain.
Challenge: The rot ran further than the walkthrough showed. Scope was updated mid-project with a written change order before any extra work.
Result: Years added to the deck's life. The client came back for accent lighting on a follow-up visit.
Same-day supply-line repair
BearSame dayEmergency
Scope: Burst supply line under a kitchen sink. Water shut at the main, new shutoff valves and braided flex lines, dry-out check.
Challenge: Early water damage on the cabinet floor, flagged for follow-up while keeping the kitchen usable the same day.
Result: Morning call, on site within two hours, water back on by early afternoon.